2nd
Petrochemicals Division
A. History
FCFC’s investments under the No. 6 Cracking Project
included plants in Mailiao and Haifeng
compounds for the production of aroma and its downstream petrochemical
materials. During the plant construction stage, three expansion units were in
charge of different projects. That is, the 2nd Chemical Division oversaw the
construction of Aroma Plant 1, Aroma Plant 2 and SM Plant in charge by the 1st
Petrochemical Section; the 2nd Petrochemical Section, directly under the
President’s Office took charge of the construction of DMF, PP and phenol
plants; the 3rd Chemical Division was responsible for the construction of PTA
plant. The phase 1 of the No. 6 Cracking Project was on schedule and completed
by the end of 1998. From January 1, 1999 on, a new Plastics Division was set up
to take over the production and sales of ABS and PS from the 2nd Chemical
Division, while the 2nd Chemical Division changed name to “Petrochemicals
Division” to take charge of the expansion of Aroma Plant 1, Aroma Plant 2 and
SM Plant.
As the No. 6 Cracking Project entered a new
phase, the original expansion units under the project underwent reorganization
after July 1, 1999. The 1st and 2nd Petrochemical Sections were dissolved.
Plants under their charge were assigned to the respective business division. As
a result, the Petrochemicals Division is assigned to take charge of the
production and sales of aroma, SM, phenol and acetone, and hence the operations
and management of Aroma Pant 1, Aroma Plant 2, SM Plant and Phenol Plant.
The Aroma Plant 1 and SM Plant at Mailiao Area were brought on-stream at the end of 1998 and
began to supply petrochemical intermediaries to the affiliated businesses. The
SM Plant acquired Lloyd’s ISO-9002 certification in July 1999 and its
second-phase expansion is now completed and in operation; the
Aroma Plant 2 and Phenol Plant at Haifeng Area have
been in operations since July 2000. At present, all products under the Division
have received ISO-9002 certification.
As Aroma 3 and SM 3 Plants of Phase 4 Expansion
in No. 6 Cracking project shall be completed soon, the manufacture and sales of
aromatics are transferred to the new founded 1st Petrochemicals Division since
Jun 1, 2006. After adjustment, our operations include SM 1, SM 2, SM 3 and
Phenol Plants. The overall investment reaches NT$ 19.8 billions and the number of
employee is 288.
Since our establishment, we have been carrying on
rationalization in various key elements of operation with perseverance and
pragmatic approach. We also endeavor vigorously in environmental protection,
work safety, cost reduction, quality and performance enhancement. We work
closely with upstream and downstream operations under the No. 6 Cracking
Project and aspire to collaborate with other operators in the industry to
create a bright future for our petrochemical markets.
B. Major Businesses
The major businesses of 2nd Petrochemicals
Division are manufacture and sales of SM, phenol, and acetone. SM is mainly
supplied to PS and ABS Plants. Meanwhile, Phenol is mainly supplied to BPA
Plants and Acetone is supplied to BPA, Epoxy and MMA Plants. All of these
downstream users are parts of Formosa Groups. The products mentioned above are
also sold out in the Asian market if the supply is beyond the demand.